Basics
catch basin2

Water Quality
Partial (>5mm but less than full sizing)
Not Provided

Unknown

Drain insert proposed in WQMP. Drain insert is not present in the CB, But there is a CPS. Need verify as built. Detailed modeling parameters unavailable. BMP has not been delineated. BMP performance and flow volumes will be modeled at the WQMP level.
Images
Location
No Delineation Provided
Not Provided
Field Visits
Currently viewing of Field Visits Reset  Download Table
Funding Events

No Funding Events identified for this Treatment BMP

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation as Percent of Total System Volume 0% 40%