Basics
Irvine Park Drain insert2

Not Provided
Not Provided

Unknown
1

Detailed modeling parameters unavailable. BMP has not been delineated. Performance and flow volumes will be modeled at the WQMP level.
Modeling Attributes
Attribute Value
Watershed

The watershed that the BMP is located within. This field is populated by a web service hosted by OC Survey and cannot be edited directly in the tool. Request Support to contact the administrators for more information. 

Newport Bay
Treatment Rate The flowrate at which the BMP can provide treatment of runoff.
Time Of Concentration The time required for the entire drainage to begin contributing runoff to the BMP. This value must be less than 60 minutes. See TGD guidance.
Dry Weather Flow Override Indicates if the modeled values for Dry Weather Flow have been overridden
Modeled BMP Performance

This BMP is associated with a WQMP that is modeled using the simplified approach; this BMP will not be modeled explicitly.

Images

No images have been uploaded

Location
No Delineation Provided
Not Provided
Drainage Area Land Uses

No delineation is provided for this Treatment BMP. Land Use Statistics cannot be determined until a verified delineation is provided.

Field Visits
Currently viewing of Field Visits Reset  Download Table
Funding Events

No Funding Events identified for this Treatment BMP

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation in Forebay/ Pretreatment - -