Basics
ALV-DB-WCRB-1

2005
Has not been linked to a WQMP
Not Provided
Not Provided

Perpetuity/Life of Project

Provisional modeling attributes entered by Aaron Poresky on 1/21/2021 for initial dry weather flow analysis. Subject to update.
Performance / Modeling Attributes
Attribute Value
24,000 cu ft
24,000 cu ft
No - As Modeled
Modeled BMP Performance

Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %

This WQMP’s parameters have changed since the last model run; a new model run is pending to re-calculate results. Parameters for related detailed BMPs have changed since the last model run; a new model run is pending to re-calculate results. This BMP's parameters have changed since the last model run; a new model run is pending to re-calculate results.

Results last calculated at

Model results for this WQMP are awaiting calculation.

Model results for this BMP are awaiting calculation.

Images
Location
Centralized
271.50 ac
Verified
Not Provided
Drainage Area Land Uses
Refresh Land Use
(ac) (ac)
Open Space - Forest 0.23 0.00
Open Space - Irrigated Recreation 3.65 0.04
Open Space - Low Canopy Vegetation 22.74 0.00
Open Space - Low Density Development 51.11 18.93
Residential - MultiFamily 21.73 13.74
Residential - Single Family High Density 117.33 61.67
Transportation - Freeway 0.03 0.00
Transportation - Local Road 54.68 30.48
Total 271.50 124.86
Field Visits
Currently viewing of Field Visits Reset  Download Table
Funding Events

2005 Capital Construction

Amount
General Fund $117,000
Habitat Conservation Program $83,000
Partner for Fish and Wildlife Program $18,620
Total $218,620
Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation in Forebay/ Pretreatment 0% 50%
Material Accumulation as Percent of Total System Volume 0% 20%
Undesirable Vegetation Cover 0% 20%
Wetland Vegetative Cover 55% +/- 15% (40 - 70%)
Inlet Scour/Erosion 0 ft 0.5 ft